• Jl. Raya Ubud No.88, Bali 80571
  • (+62) 8167 890 129
  • Home
  • Services
  • Property
    • Property
    • Property Details
  • Pages
    • About Us
    • Agent
    • FAQ
    • 404 Page
  • News
    • News
  • Contact

News

Hi-vis supervisor inspecting corner of newly poured concrete slab, formwork and string lines, morning light
Hills District Local Build Conditions

Glenhaven New Builds: What Site Supervisors Check Before Slab

What site supervisors should check before the slab pour on Glenhaven new builds, including services and drainage placement.

By Tom Radley, 1 dayJuly 14, 2026 ago
Site supervisor in hi-vis inspecting the corner of a newly poured concrete slab with exposed steel mesh and survey pegs
Hills District Local Build Conditions

Building in Dural: Acreage, Bushfire Overlays, and Mechanical Services Planning

How bushfire attack level ratings and acreage conditions in Dural affect construction and mechanical services planning.

By Tom Radley, 2 daysJuly 13, 2026 ago
Partially built modern home on a semi-rural acreage, surrounded by eucalyptus trees and dry grassland in warm afternoon light
Hills District Local Build Conditions

New Build Conditions in Kellyville: Soil, Overlays, and Block Sizes

Soil conditions, block sizes and council overlays builders should know before starting a new build in Kellyville.

By Gabrielle Ebsworth, 4 daysJuly 11, 2026 ago
Aerial view of a new suburban subdivision under construction, with slabs and framed homes at various stages and rolling hills behind
Site Preparation & Due Diligence

Practical Completion Cleans: What Builders Should Schedule and When

When builders should schedule practical completion cleans on new builds, and why sequencing this trade correctly matters.

By Gabrielle Ebsworth, 5 daysJuly 10, 2026 ago
Vacant building block with a blank real estate sign and surveyor's pegs, rolling green hills behind in morning light
Site Preparation & Due Diligence

Due Diligence Before You Commit to a Hills District Block

What due diligence builders and buyers should complete before committing to a block in the Hills District.

By Tom Radley, 6 daysJuly 9, 2026 ago
Suburban building block with native gum trees fenced by orange safety mesh and a cleared building pad beyond
Site Preparation & Due Diligence

Tree Preservation Orders and Site Clearing Before You Build in the Hills District

What builders need to check on tree preservation orders and site clearing before starting a new build in the Hills District.

By Tom Radley, 1 weekJuly 8, 2026 ago
Exposed ceiling void with ductwork routed awkwardly around timber framing and electrical cabling
Construction Planning & Sequencing

Trade Sequencing 101: What Goes Wrong When HVAC Is an Afterthought

Why treating HVAC as an afterthought in trade sequencing causes rework, delays and commissioning problems on new builds.

By Tom Radley, 1 weekJuly 6, 2026 ago
Builder checking a delivery against a clipboard beside stacked ductwork, insulation rolls and boxed fixtures under a site shelter
Construction Planning & Sequencing

Managing Material Lead Times on a Hills District New Build

Managing material lead times and supply chain risk on new residential builds across the Hills District.

By Tom Radley, 2 weeksJuly 3, 2026 ago
Air Conditioning for New Builds in Castle Hill
Air Conditioning Services

Specifying Air Conditioning for New Builds in Castle Hill: What Builders Need to Know

Getting air conditioning right at the design stage saves time, avoids rework, and protects margins. For builders delivering new homes in the Hills District, Specifying Air Conditioning for New Builds in Castle Hill means coordinating load calculations, compliance, space planning, Read more

By Gabrielle Ebsworth, 2 weeksJuly 1, 2026 ago
Builder in hi-vis reviewing a schedule sheet while an electrician and HVAC installer work on the timber frame behind
Construction Planning & Sequencing

How to Sequence Mechanical Services Into a New Build Program

How to sequence mechanical services and air conditioning trades correctly into a new build construction program.

By Tom Radley, 2 weeksJune 30, 2026 ago

Posts pagination

1 2 Next
Archives
  • July 2026
  • June 2026
Categories
  • AC & Climate Systems for New Builds
  • Air Conditioning Services
  • Construction Planning & Sequencing
  • Hills District Local Build Conditions
  • Home Decor
  • Site Preparation & Due Diligence
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor
Facebook-f X-twitter Instagram Youtube

Quick Links

  • About Us
  • Services
  • Property
  • Agent
  • Contact
Contact Info
  • Jl. Raya Ubud No.88, Ubud, Bali - 80571
  • (+62) 8167 890 129
  • [email protected]
Newsletter
Lorem ipsum dolor sit amet, consectetur adipisci elit, sed do eiusmod tempor incididunt ut labore et dolore
Real Estate. Powered by Jeg Kit
Copyright © 2025. All rights reserved.