• Jl. Raya Ubud No.88, Bali 80571
  • (+62) 8167 890 129
  • Home
  • Services
  • Property
    • Property
    • Property Details
  • Pages
    • About Us
    • Agent
    • FAQ
    • 404 Page
  • News
    • News
  • Contact

Tom Radley

Hi-vis supervisor inspecting corner of newly poured concrete slab, formwork and string lines, morning light
Hills District Local Build Conditions

Glenhaven New Builds: What Site Supervisors Check Before Slab

What site supervisors should check before the slab pour on Glenhaven new builds, including services and drainage placement.

By Tom Radley, 1 dayJuly 14, 2026 ago
Site supervisor in hi-vis inspecting the corner of a newly poured concrete slab with exposed steel mesh and survey pegs
Hills District Local Build Conditions

Building in Dural: Acreage, Bushfire Overlays, and Mechanical Services Planning

How bushfire attack level ratings and acreage conditions in Dural affect construction and mechanical services planning.

By Tom Radley, 2 daysJuly 13, 2026 ago
Vacant building block with a blank real estate sign and surveyor's pegs, rolling green hills behind in morning light
Site Preparation & Due Diligence

Due Diligence Before You Commit to a Hills District Block

What due diligence builders and buyers should complete before committing to a block in the Hills District.

By Tom Radley, 6 daysJuly 9, 2026 ago
Suburban building block with native gum trees fenced by orange safety mesh and a cleared building pad beyond
Site Preparation & Due Diligence

Tree Preservation Orders and Site Clearing Before You Build in the Hills District

What builders need to check on tree preservation orders and site clearing before starting a new build in the Hills District.

By Tom Radley, 1 weekJuly 8, 2026 ago
Exposed ceiling void with ductwork routed awkwardly around timber framing and electrical cabling
Construction Planning & Sequencing

Trade Sequencing 101: What Goes Wrong When HVAC Is an Afterthought

Why treating HVAC as an afterthought in trade sequencing causes rework, delays and commissioning problems on new builds.

By Tom Radley, 1 weekJuly 6, 2026 ago
Builder checking a delivery against a clipboard beside stacked ductwork, insulation rolls and boxed fixtures under a site shelter
Construction Planning & Sequencing

Managing Material Lead Times on a Hills District New Build

Managing material lead times and supply chain risk on new residential builds across the Hills District.

By Tom Radley, 2 weeksJuly 3, 2026 ago
Builder in hi-vis reviewing a schedule sheet while an electrician and HVAC installer work on the timber frame behind
Construction Planning & Sequencing

How to Sequence Mechanical Services Into a New Build Program

How to sequence mechanical services and air conditioning trades correctly into a new build construction program.

By Tom Radley, 2 weeksJune 30, 2026 ago
Archives
  • July 2026
  • June 2026
Categories
  • AC & Climate Systems for New Builds
  • Air Conditioning Services
  • Construction Planning & Sequencing
  • Hills District Local Build Conditions
  • Home Decor
  • Site Preparation & Due Diligence
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor
Facebook-f X-twitter Instagram Youtube

Quick Links

  • About Us
  • Services
  • Property
  • Agent
  • Contact
Contact Info
  • Jl. Raya Ubud No.88, Ubud, Bali - 80571
  • (+62) 8167 890 129
  • [email protected]
Newsletter
Lorem ipsum dolor sit amet, consectetur adipisci elit, sed do eiusmod tempor incididunt ut labore et dolore
Real Estate. Powered by Jeg Kit
Copyright © 2025. All rights reserved.